Shrinking 5.2.2 Clamping By pressing on the tool during the subsequent heating phase you assist the gripping process. If the tool has been inserted and the shrinking time has not yet ended, it is helpful to end the heating process with the Stop button, so as not to continue to heat the tool unnecessarily. After the selected shrinking time runs out or the Stop button is pushed, the coil is brought to the upper end position (ISG3410-TWK/ -TLK) and the cooling device is pulled upwards (ISG3410-TWK). By pushing the Cool button, the cooling cycle can be started. For ISG3410-WK the chuck is lowered and cooled down with coolant. Afterwards the coil is moved into upper position. After the cooling period, the chuck is driven upwards slowly and dried with compressed air. Afterwards the chuck can be removed by the operator. 5.2.3 Releasing By pulling on the tool during the subsequent heating phase you assist the releasing process. Place the removed tool on a heat resistant surface and protect people from accidentally touching the tool and the hot clamping chuck. If the tool has been released and the shrinking time has not yet ended, it is helpful to end the heating process with the Stop button, so as not to continue to heat the tool unnecessarily. After the selected shrinking time runs out or the Stop button is pushed, the coil is brought to the upper end position (ISG3410-TWK/ -TLK) and the cooling device is pulled upwards (ISG3410-TWK). By pushing the Cool button, the cooling cycle can be started. For ISG3410-WK the chuck is lowered and cooled down with coolant. Afterwards the coil is moved into upper position. After the cooling period, the chuck is driven upwards slowly and dried with compressed air. Afterwards the chuck can be removed by the operator. 5.3 Change the ferrite disc Ensure that there is no tool holder beneath the coil. For ISG3410-WK press the Stop button for approx. 1 sec. The linear unit moves into the lower position and it is easier to change the disc. For ISG3410-TWK and –TLK move down the linear unit manually into the lower position. Press the clamping ring together and remove it from the coil. After that you can take the ferrite disc from the coil. Select the correct ferrite disc suited to the correct shank-Ø into the coil. See also Chapter 5.5.1.1, Table of factory defined parameters, page 25. After that fix the ferrite disc on the top of the coil housing with the clamping ring. For ISG3410-WK press the Stop button again for approx. 1 sec and the linear unit moves back upwards. October 2015 ISG3410 20